Tools and Items Required
...
Put on work gloves and eye protection.
Cut and remove the steel straps on the shipping crate with snips.
Disassemble the shipping crate with a hammer and pry bar. Start with removing the top, followed by the four sides.
Inspect the item(s):
Photograph any damage that may have occurred during shipping.
Verify the received goods against the packing list.
If there is any damage or shortages, you must contact Tormach within 30 days of receipt. Create a support ticket with Tormach Technical Support at tormach.com/how-to-submit-a-support-ticket for guidance on how to proceed.
Find the accessory box inside the Machine Stand, which contains the feet for the Machine Stand. Set it aside for later installation.
Remove the shipping bolts on the coolant tank, and then move it out of the Machine Stand and off of the pallet.
In the coolant tank, find four casters and their hardware.
Attach each of the four casters to the bottom of the coolant tank with four M6 × 12 mm socket head cap screws, spring washers, and flat washers. Then, set the coolant tank aside for later installation.
Remove the four nuts securing the Machine Stand to the pallet with a 17 mm wrench. Discard the four nuts.
To install the Machine Stand's feet, you must first lay it on its front surface. Put a large piece of cardboard (or similar) on the floor to protect the Machine Stand.
CAUTION! Team Lift Required: You must have the aid of more than one person to lift and move the object. The object is heavy, and lifting it by yourself can cause serious injury.Lift the Machine Stand off the pallet, and set it down on the cardboard that you put on the floor.
...
This is a section of the 1100MX operator's manual. To view the whole manual, go to Tormach document UM10586.
If you have additional questions, we can help. Create a support ticket with Tormach Technical Support at tormach.com/how-to-submit-a-support-ticket for guidance on how to proceed.