Verify the Installation
...
Push the Power button on the PathPilot controller, if it's not already powered on.
Follow the on-screen instructions to configure the PathPilot operating system and PathPilot controller.
When configuration is complete, the PathPilot operating system launches.
NOTE: After you first configure PathPilot, the operating system automatically launches whenever it's powered on.
Depending on which monitor you have, do one of the following:
Standard Monitor Go to the next step.
Touch Screen Monitor You must first make sure that the monitor is configured and calibrated. From the PathPilot interface, in the MDI Line DRO field, type
Admin Touchscreen
. Then, select the Enter key, and follow the on-screen instructions.
Rotate the Emergency Stop button one-quarter turn clockwise to release it.
...
Push the green Start button to enable the machine.
...
The axis drives are now powered on.
From the PathPilot interface, on the Status tab, verify that the Machine OK light changes from yellow to green.
The machine is powered on and ready to operate.
...
Select Reset.
...
This initializes the connection between the machine and controller.
...
This is a section of the PCNC 440 operator's manual. To view the whole manual, go to Tormach document UM10372.
If you have additional questions, we can help. Create a support ticket with Tormach Technical Support at tormach.com/how-to-submit-a-support-ticket for guidance on how to proceed.