Install the Chip Pans

It is recommended to install the ATC, if applicable, before finishing the enclosure installation.

CAUTION! Sharp Objects Hazard: Before opening the shipping crate, you must put on work gloves and safety eyewear that meets ANSI Z87+. If you don't, the shipping crate and steel straps could cut you, causing serious injury.

  1. Put on work gloves and eye protection.

  2. Cut and remove the steel straps on the shipping crate with snips.

  3. Disassemble the shipping crate with a hammer and pry bar. Start with removing the top, followed by the four sides.

  4. Clean the surfaces of the chip pans and the Machine Stand with a mild degreaser (like Simple Green®) to make sure that the butyl tape bonds to the chip pans.

  5. Find the roll of butyl tape that you set aside while assembling the Machine Stand.

  6. Remove the cover paper, and then put one strip of butyl tape along each edge on the top of the Machine Stand. Make sure that the butyl tape completely covers the space in the corners or between joints — the butyl tape should make a seal between the Machine Stand and the chip pans to help prevent leaks.

...